Required Submittals ----- Important: Project address shall be displayed on all submittal documents. Applications with incomplete submittals will be rejected and delayed.

IMPORTANT: Electronic submittal document files are required to be named appropriately to ensure efficient permit processing. Review Naming Submittal Documents prior to starting ePermit process to ensure all files are labeled appropriately. See all related ePermit submittal and resubmittal requirements to help avoid delays in processing.

  • Township Approval Form - Use form to determine if township approval is required for project location. Submit completed form with township approval signature if applicable. Do not upload f not required.
  • Contact & Contractor Form - Type or print neatly. Upload completed contact and contractor form as applicable for the project. Contacts and sub-contractors listed will be notified of permit.
  • Survey/Detail Site Plans - details shall include survey or other accurately scaled drawing showing:
    • Location and size of proposed building, other structures, and septic tanks/system
    • Location of and distances from proposed building to other structures, property lines, and septic tanks/system
  • Building Plans- Complete set of plans including structural and braced wall design, floor layout, cross sections, elevations and energy. Plans shall be uploaded as one multipage complete set (not individual sheets). Plan sheets shall only be separated if larger than 50 MB. Individual sheet uploads will not be accepted. 
    • The following details shall be identified on all Manufactured/Modular Home plans :
      • All Dimensions
      • Footing and foundations sizes with all bar placement details on foundation page. Include the type, location, and details of anchoring system.
      • Modular Homes include all header and beam sizes at all locations for site constructed structural walls.
      • Wall bracing design required for new site constructed exterior walls. Wall bracing design shall be in accordance with R602.10 shall be designed by a MN Licensed Structural Engineer or provide complete design including braced wall lines, size/location of panels, method of bracing and calculations. 
  • Specifications - Manufacturer's specifications for installation of the home as well as product installation specifications if any materials, fasteners, or anchors require specific manufacturers’ specifications for installation
  • Erosion and Sediment Control Plan and Agreement - Modular home installation with foundation, complete Erosion & Sediment Control General Notes for Building Permits form, Signed Building Permit Erosion & Sediment Control (ESC) Escrow Agreement form.
  • Erosion and Sediment Control Plans - Modular home installation with foundation, must include the following details: survey or other accurately- scaled drawing showing the location of the proposed structure, direction of water flow, location of perimeter control, how the site will be permanently stabilized and other requirements that are on the Erosion Control Agreement. For new structures, also include: low floor elevations, limits of grading / construction area, and location of rock entrance. Questions contact SWCD 
  • Septic Design - consist of: Septic Application, Site plan/drawing, design sheets, elevations, soil logs, perc tests, and signed management plan. Questions contact Scott County Environmental Services

Build-Icon


Show All Answers

1. Accessory Dwelling Unit
2. Addition (Commercial)
3. Addition (Residential)
4. Basement Finish
5. Cell Tower
6. Change of Use
7. Deck
8. Demolition
9. Fence / Retaining Wall
10. Fire (Commercial)
11. Garage/Accessory Structure
12. Manufactured/Modular Home
13. Multi-Family
14. Non Residential New (Commercial)
15. Pole Building (Residential)
16. Remodel/Repair (Commercial)
17. Remodel/Repair (Residential)
18. Reroof/Siding
19. Residential 1 or 2 Family Home
20. Solar (Commercial)
21. Solar (Residential)
22. Swimming Pool
23. Windows/Doors (In Existing Opening)